Reengineering is appropriate when an existing asset still has value but its design, reliability or performance limits the process.

Existing equipment as an engineering resource

We analyze operating problems, design, wear, maintenance and constraints to decide what should be modified, reinforced or replaced.

  • design, failure and operating-constraint analysis
  • reliability, performance and maintainability improvement
  • changes to assemblies, materials, layout or operating logic
Equipment Reengineering
Technical assessment
Assessment

Technical assessment

Design, failures, operating limits, maintainability and efficiency losses.

Engineering solution
Solution

Engineering solution

Options from local reinforcement to layout, drive, material or automation changes.

Make / modify / replace
Economics

Make / modify / replace

Cost, impact, risk, timing and effect on the production system.

What remains after the engagement

A reengineering concept, modification scope, risk and impact estimate, ready for implementation.

equipment auditreengineering conceptrisk estimateimplementation scope